Rieter

Doffing preparation

Index

All the operations already referred to have to be performed fully automatically here. In addition, there is the special preparation of tubes at the tube loading station. Conveyor belt starts to move along under the loading unit some time before the  cops are full. In the process the tubes supplied in tube boxes are inserted on the pegs of the conveyor belt so that every other peg is unoccupied. These pegs later accommodate the full cops. During this operation the conveyor belt moves slowly into its working position, until an empty tube and an empty peg are positioned in front of each spindle.