Rieter

The two-piece chute system

Index

Raw material, delivered by a fan between the  UNIflex B 60 and the chutes or by the  UNIstore A 78, travels via the transport duct, which extends over all integrated machines within a unit, into the reserve chutes (upper half of the chute) of the individual cards. The transport air escapes via a perforated sheet and is carried away by a suction duct. In this part of the chute (upper half) an electronic pressure regulator ensures an approximately constant height of material. ´

The feed roller, which seals the upper half of the chute, pushes the stock into the region of the opening roller, and this roller in turn plucks out fine tufts and discharges them into the actual feed chute (lower part). Here, controlled condensing is carried out by a metered supply of compressed air from a fan. A perforated sheet that is part of the rear wall permits the air to escape. It then flows back to the fan.

An electronic pressure switch ensures constant filling and density of material in the chute; this is obtained by adjusting the speed of the feed roll (above the opening roller).

The airflow in the chute continually carries the tufts to the zone in which the perforated sheet is currently least covered by fibers. Even distribution of tufts over the whole chute width is thus obtained.